11
5. Prepare the UPS or battery cab-
inet (the “equipment”) for rack
mounting by following instruc-
tions in the equipment’s user
manual. The equipment may
require additional parts to be
added or parts to be removed
for rack mounting. After it is pre-
pared, lay equipment in rack-
mounting position. Fasten inner
members from Step 2 to the
equipment on both sides as
shown in the figure at right with
(8) M4 screws provided in this
kit. Make sure retaining latch is
near the rear of the equipment
as shown in the figure at right.
6. Open grease packet pro-
vided in this kit. Apply a 1"
long bead of grease four
(4) places inside the bot-
tom, curved tracks of front
members as shown at
right. The grease will allow
the equipment to slide into
the bracket assemblies
more easily.
7. Insert the equipment, with inner members attached from Step 5, into
bracket assemblies by inserting top and bottom edges of inner mem-
bers into the top and bottom, curved tracks of front members and slid-
ing the equipment into rack (see figure in Step 6). Ends of inner
members are tapered to allow rear of the equipment to be angled
upward before insertion, if space allows.
Then the rear, bottom edges of inner
members can be placed into front edge
of bottom tracks, and the front of the
equipment can be tipped up into hori-
zontal position to insert the top edges of
inner members before sliding the equip-
ment into rack (see figure at right). The equipment should move
smoothly into bracket assemblies. If not, recheck alignment of front
and rear members from Steps 3 and 4.
!
CAUTION
Lifting equipment into rack may be a two-person job,
depending on weight of equipment. See equipment’s user
manual.
UPS or battery
cabinet
Front
M4
screws
M4
screws
Retaining
latch
UPS or
battery
cabinet
Apply
grease
(inside)
Apply
grease