Liebert GXT Power Supply User Manual


 
6
Support
Base
Rack-Tower models are stabilized by the supplied support bases.
See illustration for placement.
RACK-MOUNT CONVERSION DIAGRAMS
Top
Cover
Screws
Flange
Screws
Aerial View
w/top cover removed
Rubber
Feet
Lift here to
change
orientation of
display template
!
+
-
E
D
C
B
A
Fault
BYPASS
UPS
ON
BATTERY
AC
INPUT
RACK-MOUNT UPS CONVERSION AND INSTALLATION
1. Unpack the UPS carefully noting the packing method. Retain the box and
packing material for possible future shipment.
2. CAUTION: The UPS is heavy (see specifications). Take proper precautions
when lifting or moving it.
3. Visually inspect the UPS for freight damage. Report damage to the carrier
and your dealer.
4. Remove the two screws located at the rear of the top cover with a Phillips
(cross head) screw driver. Push the top cover towards back of UPS and lift
off. Remove and retain the two flange screws located at the front of UPS.