MGE UPS Systems 5000 RT Power Supply User Manual


 
2.7 Hardwire Connection of Output Power Cable to UPS
This type of connection must be carried out by qualified electrical personnel.
Before carrying out any connection, check that the battery circuit breaker and the upstream protection device
(Normal AC source) is open "0" (off).
B
AT
T
. N
O
.
20
0-
25
0V
~
,
2
4
A
R
P
O
R
S
-232
C
A
U
T
I
O
N:
D
O
N
O
T
D
IS
C
O
N
N
E
C
T
B
A
T
TER
Y
C
A
B
L
E
U
N
D
E
R
L
O
A
D
B
A
T
T
E
RY
C
O
N
NE
C
T
O
R
1
8
0
V
D
d
c
4
2
3
Note: 10’ Input cable with L6-30P (3) comes attached
by MGE UPS SYSTEMS. Output cable/conduit (2) is
not included (provided by others).
B
AT
T
. N
O
.
20
0-
25
0V
~
,
2
4
A
R
P
O
R
S
-232
C
A
U
T
I
O
N:
D
O
N
O
T
D
IS
C
O
N
N
E
C
T
B
A
T
TER
Y
C
A
B
L
E
U
N
D
E
R
L
O
A
D
B
A
T
T
E
RY
C
O
N
NE
C
T
O
R
1
8
0
V
D
d
c
2 & 3
2
3
Output Terminal
L2(N)GND L1
1. Remove the top of the terminal box cover
(2 screws) with the included screwdriver.
2. Insert the output cable/conduit (provided by others)
through the cable knockout (2).
3. Connect the outlet cable to the output terminal block.
4. Tighten the cable/conduit flange and refit the
terminal box cover by means of the 2 screws.
Always connect the ground wire first.
B
AT
T
. N
O
.
20
0-
25
0V
~
,
2
4
A
R
P
O
R
S
-232
C
A
U
T
I
O
N:
D
O
N
O
T
D
IS
C
O
N
N
E
C
T
B
A
T
TER
Y
C
A
B
L
E
U
N
D
E
R
L
O
A
D
B
A
T
T
E
RY
C
O
N
NE
C
T
O
R
1
8
0
V
D
d
c
1
2
3
Installation and User Manual
Installation
2 — 7
86-87050-00 A01