NCR RealScan 7882 Installation and Owner Guide
497-0419630 Release F 09/02
5 of 62
Installation Instructions
When installing a RealScan 7882, it is recommended that you first mount the Power
Supply and run all the cables. After connecting the unit to the host terminal, make any
necessary programming changes and scan some good tags to verify that the scanner is
communicating with the host terminal. After verifying that everything is working
correctly, mount the unit in the checkstand. If the RealScan 7882 does not work
properly, refer to the Correcting Scanner Problems section in this document.
The following flowchart shows the sequence of installation steps. Detailed descriptions
of each step follow.
18682
Installing Power Supply and
Interface Cables
Step 1
Step 2
Step 3
Step 4
Setting Program Parameters and
Verifying Host Connection
Setting the Scan Zone
Mounting the RealScan 7882