Troubleshooting
8-14
9820-A2-GB20-20
June 2000
Tests Available
The following tests are available to a FrameSaver SLV 9820 model.
Test Menu Example
main/test 9820-2M
Device Name: Node A 5/13/2000 6:02
TEST
Network PVC Tests
Data Port PVC Tests
Data Port Physical Tests
IP Ping
Lamp Test
Abort All Tests
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions, ESC for previous menu M
ainMenu Exit
PVC Tests menu selections are suppressed when no PVCs have been configured
on the interface. Check that both ends of the cables are properly seated and
secured.
Tests can be commanded from the OpenLane 5.
x
management solution using its
Diagnostic Troubleshooting graphical interface, as well as from the menu-driven
user interface.
Test Timeout Feature
A Test Timeout feature is available to automatically terminate a test (as opposed
to manually terminating a test) after it has been running a specified period of
time.
It is recommended that this feature be used when the
FrameSaver unit is
remotely managed through an inband data stream (PVC). If a test is accidently
commanded to execute on the interface providing management access, control is
regained when the specified time period expires, automatically terminating the
test.
To use this feature, enable the Test Timeout configuration option, and set a
duration for the test to run in the Test Duration (min) configuration option (see
Configuring General System Options
in Chapter 4,
Configuration Options
).