![](http://pdfasset.owneriq.net/9/38/9381e01e-545a-4786-aa43-c8b4b0ae9302/9381e01e-545a-4786-aa43-c8b4b0ae9302-bg1a.png)
Check the connections between the inverter’s cables, the batteries and the
inverter’s switch as follows:
heavy-gauge red cable assembly to positive (+) on BAT2
heavy-gauge black cable to negative (-) on BAT1
orange cable to pole on switch
orange cable to Remote (RMT) on switch
None of the inverter’s cables are attached the terminal block.
4-6 Power Options
Orange, Pole
Orange, RMT
Switch on the MWS Electrical Panel