Peerless Industries PRG-1 Projector Accessories User Manual


 
ISSUED: 08-15-07 SHEET #: 055-9491-6 06-21-10
Visit the Peerless Web Site at www.peerlessmounts.com
6 of 13
For customer care call 1-800-865-2112 or 708-865-8870.
Installation to Concrete Ceilings
Place projector mount assembly (A) on ceiling as a
template and mark the center of the two mounting holes.
Drill two 1/4" (6 mm) dia. holes to a minimum depth of 2.5"
(64 mm). Attach projector mount assembly (A) using two
Alligator
®
concrete anchors (G), two at washers (E), and
two #14 x 2.5" wood screws (F) as shown in Illustration A
and 1, 2 and 3).
NOTE: Mounting slots on projector mount assembly allow
for 30° (±15°) of swivel adjustment before fully securing
wood screws.
Tighten wood screws (F) using 3/8" (10 mm) socket or
open end wrench or phillips screwdriver until projector
mount assembly (A) is rmly attached.
1
• Concrete must be 2000 psi density minimum. Lighter density concrete may not hold concrete anchor.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard-
ware and components.
WARNING
CUTAWAY VIEW
INCORRECT
concrete
plaster/
dry wall
CORRECT
concrete
plaster/
dry wall
A
A
• Always attach concrete anchors directly to load-bearing
concrete.
• Never attach concrete anchors to concrete covered with
plaster, drywall, or other nishing material. If mounting
to concrete surfaces covered with a nishing surface is
unavoidable (not evaluated by UL), the nishing surface
must be counterbored as shown below. Be sure concrete
anchors do not pull away from concrete when tightening
screws. If plaster/drywall is thicker than 5/8", custom fas-
teners must be supplied by installer (not evaluated by UL).
• Tighten wood screws rmly, but do not overtighten.
Overtightening can damage the screws, greatly reducing
their holding power.
• Never tighten in excess of 80 in • lb (9 N.M.).
WARNING
WARNING
Illustration A
G
F
E
A
CONCRETE CEILING
ARROW ON TOP OF
PROJECTOR MOUNT
ASSEMBLY INDICATES
FRONT OF MOUNT
1
3
Drill hole and insert anchor
CONCRETE
CEILING
F
F
2
A
G
G
G
Place mount over anchor and secure with screw and
washer
After repeating step one tighten all fasteners
E
E