Powerware none Power Supply User Manual


 
INSTALLATION
EATON Powerware
®
BladeUPS
®
EBM User's Guide S 164201650 Rev 2 www.powerware.com
15
Rack Setup for the EBM
CAUTION
The EBM is heavy [77 kg (170 lb)]. A minimum of two people are required to remove the EBM
from its carton.
NOTE Mounting rails are required for each individual cabinet.
To install the EBM rail kit:
1. Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 1).
Rear
Front
Rail Assembly
Assembly Wing Nuts
Figure 1. Adjusting the Rail Depth
2. Select the proper holes in the rail for positioning the EBM and other
cabinets in the rack.
Place the first rail for the first EBM at the bottom, using positions 1
and 6 for the front hex-head screws. If you are installing additional
rails, place the next rail 4 holes above the last installed screw (see
Figure 2).
NOTE Verify that the hole patterns on the rails and mounting brackets align with the hole
pattern on the rack.