INSTALLATION
EATON Powerware
®
BladeUPS
®
EBM User's Guide S 164201650 Rev 2 www.powerware.com
16
Position 1
Position 6
Position 10
Position 15
First Rail
Second Rail
Figure 2. Front Rail Screw Positions for the EBM
3. Secure the rail to the front of the rack with two hex-head screws
(see Figure 3).
Front Rail Hex-Head Screws
Figure 3. Securing the Front Rail