Promise Technology E310s Network Hardware User Manual


 
VTrak E-Class Quick Start Guide
2
VTrak E-Class Task List
Step 1: Unpacking the VTrak (below)
Step 2: Mounting VTrak in a Rack (page 5)
Step 3: Installing Disk Drives (page 7)
Step 4: Making Management and Data Connections
Fibre Channel (page 11)
Serial Attached SCSI (page 16)
Step 5: Making Serial Cable Connections (page 22)
Step 6: Connecting the Power (page 23)
Step 7: Setting the IP Address (page 25)
Step 8: Creating Disk Arrays with WebPAM PROe (page 29)
For complete information about your VTrak E310f/s subsystem, see the VTrak
E-Class Product Manual on the CD.
Step 1: Unpacking the VTrak
The VTrak box contains the following items:
•VTrak Unit
Quick Start Guide
Front bezel and key
Left and right center-mount
brackets
Left and right mounting rails
RJ11-to-DB9 serial data cable
Screws for disk drives
(50, including 2 spares)
1.5m (4.9 ft) Power cords (2)
CD with SNMP files, Product
Manual and Quick Start Guide
Warning
The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.