Q-Logic 9200 Switch User Manual


 
SANbox 9000 Series Stackable Chassis Switch HyperStack Cable Installation
2 59238-01 A
D
Mount the Switches
Mount the switches in a rack, one on top of the
other with no more than 1U of space between
them. A cable loom can be installed in this
space.
Horizontal clearance from the CPU blades to the
rack opening or door should be 7–8 inches to
allow for HyperStack cabling.
Refer to the SANbox 9000 Series Stackable
Chassis Switch Rack Mounting Guide for
detailed mounting instructions.
Verify Domain IDs
Verify that the two switches have different
domain IDs. If they do not, change the domain ID
of one of the switches using the
Set Config Switch command.
SANbox #> show domains
Principal switch is (local): 10:00:00:c0:dd:07:4a:e8
Domain ID List:
Domain 1 (0x1 ) WWN = 10:00:00:c0:dd:07:4a:e8
Verify Firmware Version 7.8
Enter the Show Version command to verify that
the two switches have firmware version 7.8 or
later.
SANbox #>show version
****************************************************
*
*
*
* Command Line Interface SHell (CLISH)
*
*
*
****************************************************
*
SystemDescription SANbox 9000 Series
HostName <undefined>
EthIPv4NetworkAddress 10.20.11.192
EthIPv6NetworkAddress ::
MACAddress 00:c0:dd:00:71:ee
WorldWideName 10:00:00:c0:dd:00:71:ed
ChassisSerialNumber FAM033100024
SymbolicName SANbox
ActiveSWVersion V7.8.x.x.xx.xx
ActiveTimestamp day month date time year
POSTStatus Passed
PrimaryCPU CPU0
SecondaryCPUStatus HotStandby
1U Maximum