SharkRack 45U Computer Hardware User Manual


 
SharkRack Enclosure Installation Guide
ID-00210-000 REV D, ECO2773 Page 13 of 46
Unpacking Instructions- Integration Packaging (cont.)
Step Detail
CAUTION: Be sure the leveling feet are fully
raised to prevent accidental tipping.
(See Figure 7 for details.)
5. With one person on each side of the enclosure,
carefully roll it out of the wooden crate.
6. Unwrap packing material from around the cabinet.
(Optional) Store all packing materials in a safe place
for future use.
Figure 11
Shipping Crate with 42U X 37DP Cabinet Shown