Sterling SVL-D Webcam User Manual


 
SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 47 of 49
6-3 Quick Start Guide –SVL Self Contained Material Loader
Unpack all parts. Check for the following:
Material receiver with level sensor and mounting
option
Control Assembly(s)
Venturi assembly(s)
Vinyl flexible hose(s)
Compressed air hose(s)
Operating instructions (on CD)
Mount the material receiver using the flange provided on its base.
Mount the control assembly at a location that is readily accessible. Make
sure that the compressed air hose and level sensor cable are long
enough to reach the control assembly.
Connect the compressed air supply from the control assembly to the
fitting located on the material pick up wand using the poly tubing supplied
with the equipment.
Connect shop compressed air to the regulator on the control assembly.
The compressed air connection must be 70-90 psi (5-6 bar). (Minimum 8
SCFM, maximum 25.9 SCFM)
Plug the control assembly into the main power socket. Make sure that
the correct voltage is being used.
Adjust the level sensor to sense the material that is being conveyed into
the conveying hopper.
Maintain the unit as stated in Chapter 5 of this manual.
Convey material