SUPER MICRO Computer 6015TC-T Server User Manual


 
2-6
SUPERSERVER 6015TC-T/6015TC-10G User's Manual
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chassis
rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping
the pressure even on both sides (you may have to depress the locking tabs when
inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click".
Installing the Server into a Telco Rack
To install the SuperServer 6015TC-T/6015TC-10G into a Telco type rack, use two
L-shaped brackets on either side of the chassis (four total). First, determine how
far the server will extend out the front of the rack. Larger chassis should be posi-
tioned to balance the weight between front and back. If a bezel is included on your
server, remove it. Then attach the two front brackets to each side of the chassis,
then the two rear brackets positioned with just enough space to accommodate
the width of the rack. Finish by sliding the chassis into the rack and tightening the
brackets to the rack.
2-5 Checking the Serverboard Setup
After you install the 6015TC-T/6015TC-10G in the rack, you will need to open the
top cover to make sure the serverboard is properly installed and all the connections
have been made.
Accessing the Inside of the System
Grasp the two handles on either side and pull the system straight out until it 1.
locks (you will hear a "click").
Remove the four screws (two on the sides and two on the top) that secure 2.
the top cover to the chassis. Place your thumbs in the two rectangular recess-
es and push the cover away from you (toward the rear of the chassis) until it
stops. You can then lift the top cover from the chassis to gain full access to
the inside of the server (see Figure 2-4).
To remove the system from the rack completely, depress the locking tabs in 3.
the chassis rails (push the right-side tab down and the left-side tab up) to
continue to pull the system out past the locked position.