TRENDnet 4-Port Powerline 500 AV Adapter Network Hardware User Manual


 
TPL-4052E User’s Guide Appendix
© Copyright 2013 TRENDnet. All rights reserved.
24
3. Within 2 minutes, push and hold the Sync buon on Adapter B for
2 seconds and release it. The Power (PWR) LED will start blinking.
This will establish connecvity between Adapter B, Adapter D, and
Adapter E by reconguring the network name of Adapter B to match
the network name of Adapter D and Adapter E. All LEDs will turn o
and turn back on and the Powerline (PL) LED will turn on the when
adapters are connected�