Testing Commands
The H2TU-C testing commands are used to initiate and
terminate loopbacks and disconnect for testing
purposes. Table 8 lists and defines the TL1/Litecraft
testing commands.
NOTE
Before entering loopbacks, the user needs to
remove the card from service. This can be done
with the RMV-HDSL command. The card can
then be restored to service with the RST-HDSL
command.
NOTE
When entering access identification (AID), the
user needs to specify whether a loopback
command is for a C or an R. For example,
AID=RT-1-21-C.
Alarms
The selectable alarm threshold crossing alerts are as
follows:
SNR margin threshold
HDSL2 and DS1 15-minute ES, SES, UAS
thresholds
1LT
sdnammoC
tfarcetiL
sretemaraP
C-UT2H
snoitpO
elbaliavAC-UT2H
sgnitteS
gnidnopserroC
sgnitteStfarcetiL
LSDH-KBPL-RPO)C-DIA(NCOLkcabpooLkrowteNC-UT2HpUpooLDNEN
LSDH-KBPL-SLR)C-DIA(NCOLkcabpooLkrowteNC-UT2HnwoDpooLDNEN
LSDH-KBPL-RPO)C-DIA(NCOLkcabpooLremotsuCC-UT2HpUpooLDNEF
LSDH-KBPL-SLR)C-DIA(NCOLkcabpooLremotsuCC-UT2HnwoDpooLDNEF
LSDH-KBPL-RPO)R-DIA(NCOLkcabpooLkrowteNR-UT2HpUpooLDNEN
LSDH-KBPL-SLR)R-DIA(NCOLkcabpooLkrowteNR-UT2HnwoDpooLDNEN
LSDH-KBPL-RPO)R-DIA(NCOLkcabpooLremotsuCR-UT2HpUpooLDNEF
LSDH-KBPL-SLR)R-DIA(NCOLkcabpooLremotsuCR-UT2HnwoDpooLDNEF
Table 8. Testing Commands
HDSL2 and DS1 daily ES, SES, UAS thresholds
HDSL2 loop attenuation threshold
DS1 15-minute CV-L, B8ZSS-L, and PDVS-L
thresholds
DS1 daily CV-L, B8ZSS-L, and PDVS-L
thresholds
The following additional alarm conditions are
provided by the H2TU-C:
HDSL2 LOSW alarm
HDSL2 unit failure alarm
HDSL2 loop continuity alarms
HDSL2 circuit reset
DS1 LOS alarm
H2TU-R AIS, RAI, INCRAI-CI
Power Requirements
When deploying any Litespan H2TU-C, the power
requirements for the application should also be
considered for product mix calculations and
maximum number of Litespan H2TU-Cs within a
channel bank assembly. Use Worksheet PW-1 in the
“Engineering and Planning” section of Alcatel
practice, OSP TL1 Software Documentation, release
7.1 or higher, to determine whether a particular
combination of channel units is within power-drain