32-Port 10/100Mbps Ethernet Switch User Guide
12 AirLink+
Unpacking
Open the shipping cartons of the Switch and carefully
unpacks its contents. The carton should contain the
following items:
• One the 32-port 10/100Mbps Ethernet Switch
• One AC power cord
• Four rubber feet to be used for shock cushioning
• Screws and two mounting brackets
• This User Guide
If any item is found missing or damaged, contact your local
reseller for replacement.
Installation
The site where you install the hub stack may greatly affect
its performance. When installing, consider the following
pointers:
• Install the Switch in a cool and dry place. See
Specifications for the acceptable temperature and
humidity operating ranges.
• Install the Switch in a site free from strong
electromagnetic field generators (such as motors),
vibration, dust, and direct exposure to sunlight.
• Leave at least 10 cm of space at the front and rear of the
hub for ventilation.
• Install the Switch on a sturdy, level surface that can
support its weight, or in an EIA standard-size
equipment rack. For information on rack installation,
see the next section, Rack Mounting.