Page 32 | AlliedWare™ OS How To Note: EPSR
EPSR State and Settings
EPSR State and Settings
To display the EPSR state, the attached VLANs, the ring ports, and the timer values, use the
command:
show epsr
Master Node
in a Complete
Ring
The following diagram shows the output for a master node in a ring that is in a state of
Complete. As well as giving the state as Complete, it also shows that port
1
is the primary
port and port 2 is the secondary port. Note that the secondary port is blocked, so does not
forward packets over the data VLAN (vlan2).
Transit N ode
in a Complete
Ring
The following diagram shows the output for a transit node in a ring that is in a state of
Complete. Note that the State is Links-Up, not Complete. Only the master node shows
Complete as the state.
EPSR Information
------------------------------------------------------------------------
Name ........................ test
Mode .......................... Master
Status ........................ Enabled
State ......................... Complete
Control Vlan .................. vlan1000 (1000)
Data VLAN(s) .................. vlan2 (2)
Primary Port .................. 1
Primary Port Status ........... Forwarding
Secondary Port ................ 2
Secondary Port Status ......... Blocked
Hello Time .................... 1 s
Failover Time ................. 2 s
Ring Flap Time ................ 0 s
Trap .......................... Enabled
------------------------------------------------------------------------
EPSR Information
------------------------------------------------------------------------
Name ........................ test
Mode .......................... Transit
Status ........................ Enabled
State ......................... Links-Up
Control Vlan .................. vlan1000 (1000)
Data VLAN(s) .................. vlan2 (2)
First Port .................... 1
First Port Status ............. Forwarding
First Port Direction .......... Upstream
Second Port ................... 2
Second Port Status ............ Forwarding
Second Port Direction ......... Downstream
Trap .......................... Enabled
Master Node ................... 00-00-cd-28-06-19
------------------------------------------------------------------------