American Power Conversion AIS 3000 Power Supply User Manual


 
AIS® 3000 10-40kVA, 400V, Site Preparation and Installation Manual – 990-2258 17
Floor Anchoring Preparation
Drilling floor holes for floor anchoring
Hole positions for floor anchors (stand-alone Enclosures)
Refer to this drawing for floor anchor positions for 523mm Enclosures.
Refer to this drawing for 352mm Enclosures.
If floor anchoring and battery securing is required in your area, read this section. If not,
proceed to Operating Environment. However, if you install a 352mm Enclosure, it
must always be equipped with the Enclosure Stabilizing Bracket for enhanced stability
(not necessary to bolt the Enclosure Stabilizing Bracket to the floor in non-seismic
areas).
If your UPS installation requires floor anchoring and battery securing, the UPS
installation must be anchored to the floor, re-using the brackets that secured the Enclosure
to the pallets during shipment. For easy determination of where to drill the holes, refer to
the applicable drawings below indicating hole positions and size.
5.11in/
130mm
5.11in/
130mm
5.11in/
130mm
5.11in/
130mm
5.11in/
130mm

650mm
575mm 404mm
Top view of bottom
plate of 523mm
Enclosure
Top view of
bottom plate
of 352mm
Enclosure
Rear Rear
Floor
anchor
hole
Floor
anchor
hole
Floor
anchor
hole
Floor anchor hole
Castor
Floor
anchor
hole
Floor anchor hole