American Power Conversion PD60F6FK1 Power Supply User Manual


 
2 60 kW InfraStruXure PDU — Operation and Configuration
Warnings
Receiving/moving
Do not tilt the PDU greater than 45° from its vertical axis. Never lay the PDU on its side.
Installation/Maintenance
Only a certified electrician can:
Connect the PDU to its power source
Connect a switch to the EPO interface on the PDU
Install a customer-specified, hard-wired power cable
Only a certified electrician or an APC Field Service Engineer can perform maintenance of the PDU.
When connecting the PDU to utility, a circuit breaker must be installed to protect the PDU against
over-current. Determine the type of circuit breaker that you need to install:
Maintenance performed while the PDU is receiving input power
APC does not recommend that you perform maintenance of the PDU while it is receiving input
power. However, due to the critical nature of data center loads, this may occur. If you must perform
maintenance while the PDU is receiving input power, observe the following precautions to reduce the
risk of electric shock:
1. Never work alone.
2. Perform the maintenance only if you are a certified electrician who is trained in the hazards of
live electrical installation.
3. Know the procedure for disconnecting electricity to the PDU and the data center in case of an
emergency.
4. Wear appropriate personal protective equipment.
5. Use double-insulated tools.
6. Always follow local and site regulations when working on the PDU.
Input Voltage Circuit Breaker Sizing
208V 225A
480V 90A
600V 75A