Issue 1 September 2005 5
Chapter 1: Before you Start
Before you install your Avaya Switch, prepare all the information, resources, and tools that you
need during the installation process. Good preparation ensures a smooth installation with the
least amount of interruption.
!
WARNING:
!
WARNING: ONLY TRAINED AND QUALIFIED PERSONNEL SHOULD BE ALLOWED TO
INSTALL OR REPLACE THIS EQUIPMENT.
!
WARNING:
!
WARNING: EQUIPMENT MUST BE CONNECTED TO AN EARTHED MAINS
SOCKET-OUTLET.
Gathering Information
Defining the Installation
The P333R can be installed in several different configurations. Before you start the installation,
find out what configuration is needed for your site.
Preparing Contacts you might need
Ensure that you have the names and phone numbers of any people you might need to contact
at the installation site. This list might include the people responsible for:
● Network architecture
● System administration
● Site security
● Site deliveries