APC 175kW Power Supply User Manual


 
150/175kw Modular PDU Installation6
Perform Equipotential Bonding
Proper bonding is essential to create an equipotential plane
between service grounds and equipment during fault and
transient conditions.
Connect the two equipotential bonding conductors between
adjacent enclosures in the system. The bonding conductors are
pre-connected to the PDU. The M8 nuts and washers are
supplied in the accessory kit. Move the equipotential bonding
wires to fit your system configuration.
Connect and Level Enclosures
The equipment must be installed on a level floor. The
leveling feet will stabilize the enclosure, but will not account
for a badly sloped floor. If the PDU is on a raised-tile floor,
verify that it is properly aligned with the tiles.
1. Align the enclosures.
2. Use a screwdriver to lower the four leveling
feet.
3. Use a 13/17 mm wrench to adjust the leveling
feet. Do not move the enclosure after the
leveling feet have been lowered.
4. Turn the joining brackets and secure with a
screw to connect the enclosures.
pdx0850a
pdx0852a
pdx0851a