APC 175kW Power Supply User Manual


 
150/175kw Modular PDU Installation16
Options
Shielding Troughs
1
Snap an APC-provided trough into slots on the roof of the PDU. The tabs at the base of the trough must
fit securely into the slots.
Note: Properly align the PDU trough with troughs installed on top of the enclosures located adjacent to
the PDU.
2
Feed PDM cables through the roof of the PDU and into the trough system for connection with the
appropriate rack-mount PDUs.
pdx0844a