InRow RC Installation16
Mechanical Connections
Piping
Note: Ensure coolant water quality complies with guidelines set forth in IB0125GB001.
Water. Install shutoff
valves for routine
service and
emergency isolation
of the equipment.
When a CDU is not
used, you must install
circuit setters to
regulate the chilled
water flow for each
InRow RC air
conditioner. See
“Piping Diagrams,”
beginning on page 8.
Layout and piping
considerations.
Fluid pipes are not
allowed directly
above electrical
equipment. All
piping must be
installed above the
aisles as shown. If
any piping makes a
turn, or must be
routed over electrical
equipment, there
must be a drip tray
under the pipe that
will protect the
equipment from
condensation and
leaks. All piping
must be kept separate
from any electrical
runs or wiring.
Insulation. Insulate
water lines to protect
personnel and to minimize condensation.
Note: Using either tape or glue, completely seal the insulation boots covering the unused
supply and return connections.
NetShelter
NetShelter
PDU
UPS
NetShelter
NetShelterNetShelter NetShelter
NetShelter
RC RC
CDU
na1941a
NetShelter NetShelterNetShelter NetShelter
RC RC
NetShelter
NetShelterNetShelter
PDU
UPS
NetShelter
RCRC
NetShelter NetShelter
CDU
Top piping examples shown
Hot Aisle Containment
InRow