APC CTSLLP/G Power Supply User Manual


 
3
Chapter 2 Installation
Only trained service personnel should install and maintain the power supply.
Prior to installation, utility line voltage must be routed to the enclosure. Local, state, federal and/or
National Electric Code (NEC) regulations regarding location, permits and electrical wiring must be
adhered to.
Do not operate the power supply where the temperature and humidity are outside the specified limits.
See Specifications in this manual.
Unpacking
Inspect the unit upon receipt. Notify the carrier if there is damage.
The packaging is recyclable; save it for reuse or dispose of it properly.
The package contains:
the enclosure
a temperature sensor
SLLP models; wiring harness
product documentation
Models Supported
Model Number Description
CTSLLGULH110S1 Enclosure, SLL-G, 120 Vac, SM Ready, UL
CTSLLPULH100S1 Enclosure, SLL-P, 120 Vac, SM Ready, UL
CTSLLGECH220S1 Enclosure, SLL-GEC, 230 Vac, SM Ready. CE