Apple 3X108 Server User Manual


 
USB Tests
Connect USB devices before running USB tests.
Test Estimated completion time Description
Presence 1 second Veries that a USB device is
connected.
Video Controller Tests
To run these tests, a display that supports 1024 by 768 or higher resolution must be
attached to graphics cards being tested. The displays can’t be in sleep mode. For
example, if you have two graphics cards, they both need a display attached and both
displays must not be in sleep mode.
Test Estimated completion time Description
OpenGL Point 10 seconds Veries video controller using
a 2D point test.
OpenGL Line 10 seconds Veries video controller using
a 2D line test.
OpenGL Triangle 10 seconds Veries video controller using
a 2D triangle test.
OpenGL Quad 10 seconds Veries video controller using
a 2D quadrilateral test.
OpenGL Quad with Texture 10 seconds Veries video controller using
a 2D textured quadrilateral test.
OpenGL Rectangle 10 seconds Veries video controller using
a 2D rectangle test.
OpenGL Cube 10 seconds Veries video controller using
a 3D cube test.
OpenGL Cube with Fog 10 seconds Veries video controller using
a 3D cube with fog test.
OpenGL Wireframe 10 seconds Veries video controller using
a 3D wireframe test.
OpenGL Solid Red Model 10 seconds Veries video controller using
a 3D solid red model test.
OpenGL Solid Red Model with
Fog
10 seconds Veries video controller using a
3D solid red model with fog test.
Fragment Instruction 1 minute Tests every instruction of the
ARB fragment program.
Vertex Instruction 40 seconds Tests every instruction of the
ARB vertex program.
48 Appendix Server Diagnostics Test Reference