ATEN Technology CS9138 Switch User Manual


 
2. Hardware Setup
11
6. Turn on the power to all the computers.
Note: The Power On sequence requires that all Second Stage units be
powered on first. After all the Second Stage units have been
powered on, the First Stage unit must be powered on next. After the
Second and First stage units have been powered on, the computers
can be powered on.
Two Stage Installation Diagram:
cs91348.book Page 11 Thursday, May 3, 2007 2:28 PM