Barco R5976907/00 Projector User Manual


 
2. Check up the D-Cine Premiere DP100
Max.
Min.
Image 2-5
Manometer view
A rapid/significant drop in system pressure indicates leakage. Verify whether the cir
cuit shows any visible
signs of liquid leakage. Refer the problem to a qualified Barco service center.
Minor drops in pressure over time are to be expected. Once the minimum pressure is reached, pre-pressurize
to approximately 1 bar (projector off).
If this cannot be achieved, proceed to liquid re-filling procedure (Described in the installation manual of the
projector).
2.4 Exhaust on Dirt
Access to the Exhaust
Access to the exhaust for checkup, see "Cleaning the Blower on top of the Projector Head", page 27.
R5976907 D-CINE PREMIERE DP100 02/11/2005
7