B&B Electronics MAP450D Mouse User Manual


 
2. Connecting the MAP450D to a Host Controller
It is necessary to follow all installation procedures described in this chapter for
electrical noise immunity and CE compliance.
STEPS
1. Remove the four screws from the back of the OIT enclosure and open the two
halves.
2. A strain relief is provided for wiring access and sealing. The cable must be
inserted through the strain relief and into the cover.
3. Remove the black heatshrink tubing from the end of the OIT operating cable.
4. Slide the ferrite coil over the OIT operating cable. This usually requires
rotating the ferrite coil back and forth while simultaneously pulling on the
OIT operating cable.
5. Slide the ferrite coil up against the inside wall of the OIT enclosure and pull
through enough additional cable to reconnect the OIT operating cable wires.
INSTALLATION MANUAL 7
1010-0046A, REV 00
OIT Operating
Cable
Install the
ferrite coil here
Case GND
OIT Power Suppl
y
Operating Cable
specific for the
Host/Controller
Host/Controller
Output
Tighten
Terminal
Block
Figure 3 MAP450D Cable Connections