![](http://pdfasset.owneriq.net/c/f4/cf4e46f0-1c89-49b0-a477-ca07b84907ea/cf4e46f0-1c89-49b0-a477-ca07b84907ea-bg2f.png)
Unpacking and Installing Your ELS10-26
2-15
b. Verify proper crossing over of fiber strands between the
applicable port on the ELS10-26 and the fiber optic device
at the other end of the fiber optic link segment.
c. Verify that the fiber connection meets the dB loss
specifications.
If a Link has not been established, contact Cabletron Systems
Global Call Center. Refer to Section 1.2, Getting Help, for details.
The ELS10-26 is now ready to be set up through Local
Management. Refer to Chapter 4, Monitoring and Managing Your
ELS10-26, to configure the ELS10-26.