![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/4/5e/45ec7329-eed2-4ad3-833e-bfcc1992e4cd/45ec7329-eed2-4ad3-833e-bfcc1992e4cd-bg24.png)
Installation
36 Installation and Configuration Guide Avaya C360 Multilayer Stackable Switches, version 4.5
Site Preparation
You can mount the C360 alone or in a stack in a standard 19-inch equipment rack located in a
wiring closet or equipment room. You can build a logical stack of up to ten C360 switches.
Ensure that the location where you install your Replace variable w/ short product name fulfills
the following requirements:
● Cables are away from sources of electrical noise such as:
● radio transmitters
● broadcast amplifiers
● power lines
● fluorescent light fixtures
● Water or moisture cannot enter the chassis.
● Air can flow freely around all sides of the chassis.
● The vents on the sides of the chassis are not blocked.
● The environmental conditions match the requirements listed in Table 6.
Table 6: Environmental Requirements
Condition Acceptable values
Ambient temperature 32
o
to 104
o
F (0
o
to 40
o
C)
Relative humidity 5-95% non-condensing
Weight support 10.8-15 lbs (4.9-6.8 kg)