Cisco Systems 4900 Series Switch User Manual


 
CHAPTER
3-1
Catalyst 4900 Series Switch Installation Guide
78-18039-02
3
Installing the Switch
This chapter describes how to install the Catalyst 4900 series switch. For
first-time installations, perform the procedures in the following sections in the
order listed.
Verifying the Contents, page 3-1
Rack-Mounting the Switch, page 3-2
Connecting AC Power to the Switch, page 3-9
Connecting DC Power to the Switch, page 3-11
Note Before starting the installation procedures in this chapter, complete the site
planning checklist in
Chapter 2, “Site Planning,” to verify that all planning
activities were completed.
Verifying the Contents
Note Do not discard the shipping container when you unpack the switch. Flatten the
shipping cartons and store them. You will need the container if you need to move
or ship the switch in the future.