Site Preparation Checklist
D-2
Cisco MDS 9216 Switch Hardware Installation Guide
78-16165-01
Table D-1 Site Planning Checklist
Task No. Planning Activity Verified By Time Date
1 Space evaluation:
• Space and layout
• Floor covering
• Impact and vibration
• Lighting
• Maintenance access
2 Environmental evaluation:
• Ambient temperature
• Humidity
• Altitude
• Atmospheric contamination
• Air flow
3 Power evaluation:
• Input power type
• Power receptacles
1
• Receptacle proximity to the
equipment
• Dedicated circuit for power supply
• Dedicated (separate) circuits for
redundant power supplies
• UPS
2
for power failures
4 Grounding evaluation:
• Circuit breaker size
• CO ground (AC- powered systems)