Cisco Systems C65 Network Router User Manual


 
Chapter 4 Deploying the C65/76M
Managing a Catalyst 6000 Family Switch or a Cisco 7600 Series Internet Router
4-2
Cisco 6500/7600 Manager User Guide
OL-2209-01
Deploying Objects
The deployment process should be done after you install the C65/76M software
for the first time, or after you install new hardware. Deployment informs the C65/
76M of the presence of supported hardware.
The C65/76M objects can be automatically discovered or manually deployed.
Objects can also be predeployed in CEMF before the actual installation of a
Catalyst 6000 family switch or a Cisco 7600 series Internet Router in the field.
Predeployment is the process of reserving a space in CEMF for network
equipment, which has not yet been physically slotted into the system rack. When
an object or device is predeployed, the physical device or object is not present, but
CEMF has been preconfigured to hold an object of similar type. As a result, C65/
76M module objects can be deployed and the C65/76M will not monitor their
status. When a module is then placed in the physical equipment, the new module
will be automatically detected and management of the module will be
automatically started.
C65/76M Object Hierarchy
A fully deployed C65/76M object in CEMF has the following object hierarchy:
Network Element
Chassis
Power Supplies
Supervisor Modules
Ethernet Interfaces
Ethernet Modules
Ethernet Interfaces
Switch Fabric Modules
FlexWAN Modules
Port Adapter
ATM Port Adapter
ATM SONET Interfaces
ATM E3 Interfaces
ATM T3 Interfaces
OSM GeWAN Modules
OSM GeWAN Interfaces
OSM PoS Modules
Ethernet Interfaces
OSM PoS Interfaces