Cisco Systems C65 Network Router User Manual


 
4-57
Cisco 6500/7600 Manager User Guide
OL-2209-01
Chapter 4 Deploying the C65/76M
Deployment and Commissioning Process
Port Adapters
To predeploy a port adapter, the FlexWAN module must first be deployed (see the
“FlexWAN Module” section on page 4-53). Choose the Deployment > Deploy
Port Adapter(s) option in the pop-up menu from the FlexWAN object (see
Figure 4-43).
Figure 4-43 Predeploying Port Adapters
The Port Adapter Deployment Wizard—Object Parameters window is displayed
(see Figure 4-44).