Cisco Systems C65 Network Router User Manual


 
Chapter 4 Deploying the C65/76M
Deployment and Commissioning Process
4-22
Cisco 6500/7600 Manager User Guide
OL-2209-01
Figure 4-15 Network Element Dialog Box
Click the Commission button from the Configuration tab to start the subchassis
discovery, which allows the C65/76M to determine which modules are installed
on the switch or router, and also allows CEMF to start monitoring the switch or
router.
Note Commissioning may take a few minutes.
Unlike the Auto Discovery process (see the “IP Auto Discovery” section on
page 4-7), no additional parameters need to be specified. These parameters were
specified in the manual Deployment Wizard (Figure 4-11). After the object is
commissioned, the Physical view will resemble Figure 4-16.