Cisco Systems OL-6157-01 Switch User Manual


 
CHAPTER
2-1
Catalyst 2940 Switch Hardware Installation Guide
OL-6157-01
2
Installation
This chapter describes how to install your switch, how to interpret the power-on self-test (POST), and
how to connect the switch to other devices. Read these topics, and perform the procedures in this order:
Preparing for Installation, page 2-1
Verifying Switch Operation, page 2-4
Installing the Switch, page 2-5
Connecting to an SFP Module, page 2-12
Connecting to 10/100 Ports and the 10/100/1000 Port, page 2-14
Connecting to the 100BASE-FX Port, page 2-15
Connecting to an SFP Module, page 2-16
Where to Go Next, page 2-17
Preparing for Installation
This section provides information about these topics:
Warnings, page 2-1
Installation Guidelines, page 2-3
Verifying Package Contents, page 2-3
Warnings
These warnings are translated into several languages in the Regulatory Compliance and Safety
Information for the Catalyst 2940 Switch.
Warning
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Statement 1030
Warning
Read the installation instructions before connecting the system to the power source.
Statement 1004