Compaq 3000 Computer Hardware User Manual


 
3-21
ProLiant 3000 Setup and Installation Guide
Writer: Tom Erber Project: ProLiant 3000 Setup and Installation Guide Comments: 296908-002
File Name: D-CH03.DOC Last Saved On: 3/10/98 9:30 AM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
Attaching the Cable Management
Arm Bracket
The cable management arm bracket fastens to the top right rear of the rack
server's chassis. The bracket provides an attachment point for the cable
management arm from the server to the rear frame of the rack.
Attach the cable management arm bracket to the back of the server with two
6-32 x 1/4 Phillips screws.
Attach the rack rail covers to the rack.
Figure 3-13.
Attaching a cable management arm bracket to the server