© 2010 CyberPower Systems (USA), Inc. All Trademarks are property of their owners.
Page: 9 of 17
4.4 Installation
4.4.1 Wall Mounting the UPS
1. Remove the UPS from the carton.
2. Get the wall mount kit.
3. Use the nuts included in the kit.
Attach both wall mount brackets to
the threaded posts on the back side
of the UPS enclosure as shown on
the right.
4. Reference the Wall Mount Chart
(scaled-down) in Appendix I to
mark the four mounting hole
locations.
5. Pre-drill the marked hole locations
to a suitable size (M8 is
recommended) for the fasteners
being used.
6. Install the fasteners and mount the
UPS to the wall.
4.4.2 Pole Mounting the UPS (Optional)
1. Remove the UPS from the carton.
2. Get the pole mount kit (ordered
separately)
3. Using the nuts included in the kit,
attach the left and right pole mount
brackets to the threaded posts on
the back side of the UPS
enclosures as shown.
4. Thread the (4) M8 x 25L hex head
screws with a lock washer and flat
head washer onto the center pole
mount bracket.
5. Using pole mount straps (not
provided), attach the center bracket
to the pole.
6. Hang the UPS (batteries not
installed) onto the center poll mount
bracket which is already on the poll.
7. Tighten the 4 screws.
Note: Using stainless or galvanized
steel straps with a width of 1-inch is
recommended.
"Warning: Risk of Electric Shock.
Mount the unit at a height greater
than 25cm from the ground surface."
Figure 7: Wall Mount Kit
Figure 8: Pole Mount Kit
Figure 9: Pole Mounting Diagram
Wall Mount
Bracket Post
Poll Mount
Bracket Post
Poll Mount
Bracket (Left)
Poll Mount
Bracket
(Right)
Center
Bracket
Tread screw and two washers
onto center bracket