INSTALLATION
EATON Powerware
®
9140 EBM User’s Guide S 164201623 Rev A FINAL DRAFT 2006 July 14
16
Unpacking the Cabinet
CAUTION
Unpacking the cabinet in a low-temperature environment may cause condensation to occur
in and on the cabinet. Do not install the cabinet until the inside and outside of the cabinet
are absolutely dry (hazard of electric shock).
To unpack the cabinet and accessories:
1. Cut the pallet straps and remove the large cardboard outer sleeve.
Have two people lift the sleeve for ease of removal.
2. The cabinet, batteries, and accessory kit are packaged in individual
cartons. Do not install the batteries until after the cabinet is installed
in the rack.
Use care when moving and opening the cartons. Leave the
components packaged until ready to install.
3. Discard or recycle the packaging in a responsible manner, or store it
for future use.
Follow these guidelines when locating the cabinet after unpacking:
S Place the cabinet in a protected area that has adequate airflow and is
free of humidity, flammable gas, and corrosion.
S Avoid placing the cabinet on its side. Make sure the air vents on the
front and rear of the cabinet are not blocked.
S The recommended configuration is to install the EBM(s) in the lower
part of the rack, with the UPS directly above the EBM(s).
Continue to the following section, “EBM Setup.”