Eaton Electrical BladeUPS Bar Power Supply User Manual


 
INSTALLATION
EATON Powerware
®
BladeUPS
®
Bar Installation Guide S 164201723 Rev P01
9
9. Place the ferrite assembly on the floor of the wireway and secure
with the supplied tie wrap. Loop the tie wrap through both
attachment sites on the wireway floor and through the ferrite
assembly. See Figure 4.
10. Note the orientation of the base bracket installed on the bar for later
re-installation (see Figure 5). Remove and retain the base bracket
and hardware.
11. Place the bar in the rack as shown in Figure 4.
NOTE The bar can rest on the floor of the rack until secured in place. After complete
installation, the bar will be secured to the rack and wireway as shown in Figure 4.
Ferrite Assembly
(secured to
wireway floor with
tie wrap)
Rear of Rack
Bar
Wireway Floor Tab
(above bar base sheetmetal)
M6 Hex Nuts
on Wireway
Studs
(3 places)
Figure 4. Ferrite and Bar Placement