Eaton Electrical BladeUPS Bar Power Supply User Manual


 
INSTALLATION
EATON Powerware
®
BladeUPS
®
Bar Installation Guide S 164201723 Rev P01
14
19. Using five M4×8 pan-head screws, install the wireway access
cover. See Figure 9. Torque the screws to 1.7 ± 0.2 Nm
(15 ± 2lbin).
M4×8 Pan-Head Screws
(5 places)
Wireway Access Cover
Figure 9. Wireway Access Cover Installation
20. Verify the six information labels are attached to the wireway as
shown in Figure 10.
Figure 10. Wireway Labels