Eaton Electrical BladeUPS Bar Power Supply User Manual


 
INSTALLATION
EATON Powerware
®
BladeUPS
®
Bar Installation Guide S 164201723 Rev P01
13
17. Using two M6×12 hex bolts, secure the left side of the wireway
terminal block housing to the rack. See Figure 8. Torque the bolts to
5.1 ± 0.8 Nm (45 ± 7lbin).
18. Using nine M4
×8 pan-head screws, secure the wireway terminal
block housing to the wireway and to the bar. See Figure 8. Torque
the screws to 1.7 ± 0.2 Nm (15 ± 2lbin).
M6×12 Hex Bolts
(2 places)
M4×8 Pan-Head Screws
(9 places)
Wireway
Terminal Block
Housing
Figure 8. Wireway Terminal Block Housing Installation