Eaton Electrical BladeUPS Bar Power Supply User Manual


 
INSTALLATION
EATON Powerware
®
BladeUPS
®
Bar Installation Guide S 164201723 Rev P01
12
16. Install two M4×8 pan-head screws into the tab on the wireway
floor, securing the base of the bar to the wireway. See Figure 7.
Torque the screws to 1.7 ± 0.2 Nm (15 ± 2lbin).
Rear of Rack
Wireway Floor Tab
(above bar base sheetmetal)
M4×8 Pan-Head Screws
(2 places)
Figure 7. Wireway Tab Attachment