Emerson 15-90KVA Power Supply User Manual


 
Installation
12
2.5 Mechanical Considerations
The Liebert
®
APM
is constructed with a steel frame and removable panels. Top and side panels are
secured to the chassis by screws. The doors may be opened for access to power connections bars,
auxiliary terminals blocks and power switches.
The UPS comes with an Operator Control Panel that provides basic operational status and alarm
information. The cabinet houses both the power components and the internal batteries. Cooling is
provided by internal fans. The unit sits on four casters. Adjustable stops are provided to prevent the
UPS from moving once it has been moved to its final position.
2.5.1 Clearances
There are no ventilation grilles on the sides of the UPS. The sides must be accessible during
installation. After installation, the unit must have a clearance of 12 in. (305mm) in the rear to permit
adequate circulation of air exhausted from the UPS. The Top Fan option eliminates the 12" (305mm)
rear clearance requirement, but it increases the Liebert APM’s height by 7.63" (194mm).
To enable routine tightening of power terminations within the UPS, make sure there is sufficient
clearance in front of the Liebert APM to permit free passage of personnel with the door fully opened.
Leave a minimum of 24 in. (610mm) between the top of the UPS and the ceiling to permit adequate
air circulation above the unit. Emerson recommends against using air conditioning or other systems
that blow air onto the top of the unit.
2.5.2 Floor Installation
If the Liebert APM, Liebert BDC or battery cabinet is to be placed on a raised floor, the UPS should be
mounted on a pedestal that will support the equipment point loading. Refer to the bottom view in
Figures 31, 37 or 40 to design this pedestal.
2.5.3 Cable Entry
Cables can enter the Liebert APM, Liebert BDC and battery cabinets from the top or bottom through
removable metal plates.
Some plates have factory-punched holes and others are designed to allow the personnel to punch
holes for fitting and securing the conduit. Once the conduit holes are punched, these plates should be
reattached to the UPS. The conduit size and wiring method must be in accordance with all local,
regional and national codes and regulations, including NEC ANSI/NFPA 70.
The UPS must be accessible from the right side to allow personnel to complete the cable connections
and make necessary adjustments. After installation is complete, the Liebert APM may be serviced
from the front.
!
WARNING
Risk of heavy units tipping over while being moved. Can cause property damage, injury and
death.
The Liebert BDC
and battery cabinets must be properly prepared and secured for lifting.
Improper lifting may cause the cabinets to fall, causing personal injury or death and
equipment damage.
Emerson recommends lifting the units with one of the following methods:
Installing four eyebolts in the factory-fabricated holes, one at each corner of the unit,
attaching cables or similar strapping to the eyebolts and lifting with a suitable mechanism.
Placing suitable straps on the Liebert BDC
or battery cabinet. The straps must go under
the unit to be lifted.
NOTE
When installing the UPS, the customer must provide a disconnect with overcurrent protection
at the output of the UPS.