Enterasys Networks 7S4280-19-SYS Computer Hardware User Manual


 
Overview of the NAC Controller PEP Shutdown Procedure
Enterasys NAC Controller Hardware Installation Guide 5-7
Recommended Shutdown Procedure
BeforepullingaNACControllerPEPoutofachassis,
pressortaponits
OFFLINE/RESETswitchforlessthan1 second.
ItsCPULEDchangesfromsolidgreentoblinkingbetweengreenandamber,indicatingthatthe
moduleisshuttingdown.Attheendoftheshutdownroutine,theCPULEDchangestoa
67%/33%sequenceofamber/off,respectively,indicatingthemoduleisinahalt
state.Inthistimeit
issafetorestartorremovethemodulefromthechassis.
Whenacontrolledshutdownisinitiatedfromthe
OFFLINE/RESETswitch,youhave60seconds
fromthetimetheCPUstartsalternatelyflashingamber/offuntilthedeviceautomaticallyrestarts.
Last Resort Shutdown Procedure
ToresetaNACControllerPEPwithoutitperforminganorderlyshutdownroutine,
pressandholdthe
OFFLINE/RESETswitchforapproximately6seconds.
PullinganyNACControllerPEPoutofthechassisbeforeithasbeenshutdownisnot
recommended.Theonlysafetimetopullamoduleoutofthechassisisafterthecompletionofa
shutdownandthemanagementLEDisalternatelyflashingamber/off.
Caution: Do not remove a NAC Controller PEP from an operating chassis system before reading
the following information and instructions.
Precaución: Antes de retirar los módulos DFE del chasis en funcionamiento, lea las siguientes
instrucciones y la información suministrada.
Note: The only safe time to pull a chassis out of the chassis is when the CPU LED is alternately
flashing amber/off. Otherwise, system operation will be interrupted.
Caution: This method of shutting down a NAC Controller PEP is not recommended except as a last
resort, because all processes currently running on the module will be interrupted resulting in loss of
frames.
Precaución: No se recomienda utilizar este método para apagar los módulos DFE. Recurra a él
sólo como último recurso, puesto que interrumpe todos los procesos del módulo en
funcionamiento, lo que podría resultar pérdidas de frames.