Fujitsu MAG3182LC Computer Drive User Manual


 
C141-E064-03EN 4 - 23
(6) Cable connection requirements
The requirements for cable connection between the IDD, host system, and power supply unit
are given in Figure 4.25. Recommended components for connection are listed in Table 4.1.
Figure 4.25 SCSI cables connection
External operator panel
(example)