2-6
Installing the Switch
Installation Procedures
2. Verify the Switch Passes Self Test
Before mounting the switch in its network location, you should first
check that it is working properly by plugging it into a power source
and verifying that it passes its self test.
1. Connect the adapter’s power cord to the power connector on the
back of the switch, and then plug the AC power adapter into a
nearby properly grounded electrical outlet.
2. Check the LEDs on the switch. The LED behavior is described
below.
Note
The switch does not have a power switch. It is powered on
when the AC power adapter is connected to the switch and
to a power source.
Caution
Use only the AC power adapter supplied with the switch.
Use of other adapters, including those that came with other
ProCurve Networking products, may result in damage to
the equipment.
Connect power cord to
the power connector