HP (Hewlett-Packard) GS1280 Computer Hardware User Manual


 
Step 1 - Requirements
Step 1a - System Requirements
Mandatory Purchases:
The system cannot function without these options or services - the option or service must be
ordered with the system.
Base System (Step 2)
Dual CPU Building Block Modules (Step 3)
Memory (Step 4)
Master I/O Building Block Drawer (Step 5)
Power Distribution Unit(s) (Step 6)
Optional Purchases:
I/O Building Block Drawer(s) (Step 5)
System disk(s) (Step 5)
Dual AC Power (Step 7)
Internal System Expansion (Step 8)
External Rack Expansion - (Step 9)
Other (see ES/GS Common Options)
Recommended Services:
HP Care Pack Service Package (see ES/GS Common Options - Step 12)
Step 1b - Requirements for Partitions
A single AlphaServer GS1280 can be divided into logical hardware partitions as small as two processors, each running an
instance of Tru64 UNIX or an instance of OpenVMS. Each partition is allocated its own dedicated "shared-nothing" set of
hardware resources: CPU module(s), memory module(s), and I/O. Each hardware partition is viewed as a unique node, from
a system point-of-view, with its own instance of Tru64 UNIX or OpenVMS operating system and application software,
independent system console, and error log.
Minimum Hardware and Software Required per Hardware Partition
QuickSpecs
HP AlphaServer GS1280 Systems
Systems
DA - 11921 Worldwide — Version 24 — July 23, 2007
Page 7