LevelOne FNS-7000 Network Card User Manual


 
8
Put the screws into the drive tray’s down side to tighten new hard drive.
Slide the drive tray with new hard drive into the drive and push forward the panel.
The following steps will guide you through the LevelOne NAS hardware installation:
1. Connect the LevelOne NAS to your Network..
2. For GNS-8000 only: If you want to back up your files to the tape, please connect the
tape drive to the SCSI port on the back of your LevelOne NAS. Then turn on the tape
drive
3. For GNS-8000 only: To use a UPS with your unit, please connect the UPS to the RS-
232 port on the back of your LevelOne NAS via a serial cable. And connect the power
plug of the LevelOne NAS to the output power inlet of the UPS
4. Power on the LevelOne NAS.
Note: The power switch uses toggle switch design (after pushing the button it will
return to the original position). All you need to do is to flip the switch once to
turn-on or turn-off.
When all power cables have been properly connected, push the Power Switch on the back of
the LevelOne NAS. The LCD Panel will light up and the system is ready for set-up:
NAS001122 05/22
192.168.0.1 02:48
Server Name
IP Address
Date
Time